TG
Planned Acres
36,412
+312 vs Build 1
Peak Borrowing (proj.)
$71.4M
line $86.5M · headroom $15.1M
Net Cash-Flow Margin
$8.9M
Build 3 · ±$3.2M price band
Open AR (crops)
$41.2M
$5.6M due this month
BC Reconciliation
✓ May
June closes in 3 days
Alerts
7
3 moisture · 2 certs · 2 variance

Monthly cash position — 2027 actuals ▮ / forecast ▯

line limit $86.5M JanMarMayJulSepNov peak $71.4M (Jul)

Exception queue view all →

MOISTURE24-3 root zone past refill 14h — no irrigation event detected→ Josh
VARIANCEFert spend MV +$212k vs Build 3 (June)→ Taylor
CERT2 applicator licenses expire in 30 days→ HR
LOADSAcuitus: 3 tickets missing seq. #s, field Chandler→ review
PMDRMcCain contract 27-114: over-delivered 2.1%→ Ag
LEASEMohlman lease renewal window opens Aug 1→ Taylor

Planned acres by crop (Build 3)

Potato9,221
25.3%
Sugarbeet7,644
21.0%
Wheat / Barley9,010
24.7%
Corn (silage/HM)4,868
13.4%
Hay / Triticale3,912
10.7%
Onion1,757
4.8%

Live feeds last sync

Business Central GL (14 companies)synced02:10
FieldClix timecardssynced05:00
Verus soil moisture (136 devices)synced06:00
Stukenholtz lab resultssynced04:30
Truck Load Trackerlive
Acuitus potato tickets3 QA holds05:15
The grid rule: everything here works like Excel — click column headers to sort, use the filter row, tick rows (or the header box), then change crop, variety, yield or dates for the whole selection at once. The status bar below sums your selection.
Fields
642
36,412 ac assigned
Unassigned
3
212 ac
Rotation warnings
4
potato-on-potato < 3yr
Plan cost
$31.8M
$873/ac avg
Build 3 vs 1
+$412k
view diff →
fx— click a row to inspect —
sample of 642 · click a header to sort ▲▼
Field Area · Director Acres 2025 2026 2027 Crop Variety Bgt Yield Buyer intent Storage Plant window Plan $/ac Rot ✓
Plan Seed Fert Chem Water
EBITDA (Build 3)
$18.2M
Build 1: $17.8M
Peak Borrowing
$71.4M
July · 6.3% APR
Op. interest (proj.)
$3.94M
renewal: June
Carry-in AR + COH
$48.7M
auto from CY26 PMDR
Scenario
Base
price −10% → peak $76.8M
Account (BC GL)FY BudgetJanFebMarAprMayJunJul…DecActual YTDVar
Seed (5210)4,812k120k385k1,270k2,140k720k95k40k42k4,655k−3.2%
Fertilizer (5220)6,105k85k310k1,480k1,730k880k640k505k475k5,020k+4.4%
Chemical (5230)4,470k25k60k410k660k905k830k640k940k2,890k−1.1%
Rent (5410)16,240k150k210k6,850k420k180k160k120k8,150k7,810k0.0%
Labor (5510)10,890k720k705k860k1,010k1,050k1,015k990k880k5,360k+2.8%
Water & Power (5610)3,180k45k48k120k290k420k520k585k95k1,443k−0.8%
Crop Ins (5710)1,410k705k705k705k0.0%
Total cash expense62,410k2,010k2,480k13,910k8,120k5,690k4,480k4,010k11,660k31,180k+1.9%
Crop receipts78,940k6,210k4,180k2,910k1,850k1,540k2,220k3,180k14,820k21,470k+2.4%
Operating loan balance54,210k55,930k64,120k67,400k69,210k70,860k71,420k52,110k
Monthly Income Sch Loan model

Closed months (Jan–May) show BC actuals; open months show Build 3 forecast · payment-timing curves: edit reference data → · push CY2027-B3 to Business Central →

Crop value (CY27 proj.)
$104.7M
all crops · G4DF share
Contracted
61%
$63.9M committed
Open AR
$41.2M
CY26: $12.3M · CY27: $28.9M
Crops on hand
$18.4M
unsold @ proj. price
June BC recon
−$41k
2 unexplained items
Contract Crop · Class Buyer Qty Price Delivered Status AR Next pmt
27-114Potato NorkotahMcCain610k cwt$9.850%committedOct 15
27-102Potato BurbankLamb Weston480k cwt$10.400%committedNov 1
26-088Potato BurbankMart390k cwt$9.1084%delivering$3.41MJul 20
27-201SugarbeetSRCOOP (shares)7,644 acest $42/tshare$8.9M45% Dec
27-310Barley VoyagerAnheuser-Busch520k bu$7.150%committedSep 30
26-071Wheat HRWScoular310k bu$6.20100%settling$0.94MJul 8
Onion Vaquerounsold (NPE)1.02M cwtproj $8.25openCOH $8.4M

Click headers to sort — e.g. sort by AR to work the collections list top-down.

Monthly reconciliation — disposition vs BC income

Mar$6.21M / $6.21M
Apr$4.83M / $4.83M
May$3.92M / $3.92M
Jun$4.46M / $4.50M−$41k · 2 items

Dimensions: Growing Cycle · Crop · Location · Entity. Invoice-from-contract enforced; post-invoice contract edits route to Finance approval.

Position at control date (12/31 snapshot)

AR carry to CY28$36.2M proj.
COH carry$14.1M proj.
Auto-opens CY28 planno rekeying
The AgWorld fix: one operation, many fields — edit the parent once. Select rows and use the bulk bar: shift all dates, swap a product everywhere, reassign an operator — one action, preview, undo.
Open work orders
63
planting 0 · spray 41 · cult 22
Due this week
17
2,214 ac
Label checks
✓ 61
2 warnings
Operator gaps
1
WPS lapsed — J. Rios
Operation Field Ac Products Method Due Operator Label Status
Spider mite spray op #227Chandler72.0Oberon 4 SC 8 floz + Masterlock 4 flozAerialJul 15Valley AirREI 12h · PHI 5d ✓todo
Spider mite spray op #227Childs 1 & 264.0Oberon 4 SC 8 floz + Masterlock 4 flozAerialJul 15Valley Airtodo
Spider mite spray op #227DG-1150.0Oberon 4 SC 8 floz + Masterlock 4 flozAerialJul 15Valley Airtodo
Spider mite spray op #227Eden142.0Oberon 4 SC 8 floz + Masterlock 4 flozAerialJul 15Valley Airwind > label max fcsttodo
Fungicide chemigation op #23124-1124.5Tetraban 9.5 floz + Regent 4 SC 3.2 flozChemigationJul 12J. Riosblocked — WPS lapsed
Fungicide chemigation op #23124-3121.5Tetraban 9.5 floz + Regent 4 SC 3.2 flozChemigationJul 12M. Silvascheduled
Cultivate beets G2 op #218Schell East N122.9CultivatorJul 9Crew 2in progress 60%
Kill vines — early dig op #240KR-63125.5shredder + desiccant TBDShredderAug 20Crew 5pending plantodo

Spray sheet prints bilingual with mix math, map, REI/PHI + signature · operators without current WPS/applicator cert cannot be assigned · send to WhatsApp →

Field
24-1
MV 1 · Josh · Whitesides Land Ranch
Acres (operating)
124.5
FSA 121.9 · pivot + corners
2026 Crop
Norkotah TX 278
planted Apr 22 · budget 385 cwt
Root-zone moisture
62 cb
refill at 60 · irrigate soon
Lease
$385/ac
expires 2028 · fall inst. unpaid

Soil moisture — Verus DIRTdot B40TVN946YHAR8P 7 days

refill (60 cb) saturated ▲ past refill Jun 27Jun 30Jul 3

Sawtooth = irrigation sets · rain Jul 1: 0.32" · WhatsApp alert sent to Josh 06:10

Fertility (petiole) & agronomy

Soil sample 3/14N 46 · P 18 · K 310 · pH 7.9lab pdf
Lab rec N total240 lbs/acStukenholtz
Applied to date198 lbs/ac
Petiole NO₃ 6/2417,800 ppmon curve
Next tissue pullJul 8weekly cadence

Rotation (2019 → plan 2030) full matrix →

PWSBWCWWP SBWPH

This year's records

Apr 22Planted — Norkotah TX 278, 34" rows, Group 2planter monitor
May 30Hilled + Dual Magnum laybyWO #188 ✓
Jun 12Fungicide chemigation #1WO #204 ✓
Jun 29Fert order 2.1t 28-0-0 approvedpetiole →
Jul 12Fungicide chemigation #2WO #231 scheduled

Economics (Build 3)

Budget cost$837.80/ac$104,306
Actual to date$602.10/ac$74,961
Proj. revenue @ 385 cwt × $9.85$3,792/ac$472,082
Contribution margin proj.$1,822/ac$226,839
GAP field risk assessment9/15finish →
YTD hours
148,212
vs budget −2.1%
YTD employer cost
$4.61M
wages + taxes + WC
This week
6,842 h
318 people clocked
OT %
6.8%
MV harvest prep
H-2A share
41%
FICA/FUTA-exempt burden
RegionBud hrs (wk 27)Act hrsVar$/hr eff.Cost (wk)Trend
Magic Valley4,6104,388−4.8%21.40$93.9k
Lower Snake River1,2401,371+10.6%22.10$30.3k
Baker City720695−3.5%20.80$14.5k
Admin310311+0.3%46.60$14.5k
Shop / Mechanics480522+8.8%28.30$14.8k

Skills & placement 2027 review cycle

Assessments complete214 / 341
Question-bank tests taken96avg 71% · EN 58 / ES 38
Reviewer normalization9 managersfactors 0.85–1.10
Placement recs ready88review queue →
Pending WPS renewals12alerts sent

Wage decisions entered in Paylocity; FarmDB stores the rationale (test %, matrix score, band position). Timecards: FieldClix, synced 05:00 daily.

GAP audit readiness
72%
91 of 126 questions evidenced
Field risk assessments
64 / 111
potato + onion fields
Corrective actions
3 CAN
0 IAR open
Training current
94%
WPS 12 renewals pending
Policy acks
96%
2026 handbook v3

Harmonized GAP — evidence auto-filled from FarmDB

G-4 Worker education & trainingauto ✓SafetyTracker records
G-6 Traceabilityauto ✓load tracker + lots (1-up/1-back)
G-11 Ag & cleaning chemicalsauto ✓spray records, REI/PHI
F-4 Water management plan2 tests dueupload July samples
F-6 Soil amendmentsauto ✓application ledger
G-7 Recall programmock recall due Augschedule →

Certifications & training queue

J. Rios — WPS handlerlapsed 6/28blocks WO #231
2 × applicator license30 daysrenewal booked
CDL — 3 driverscurrentmed cards 2027
Forklift refresher (cellar crew)Sepbefore harvest
New-hire safety orientation6 this wkbilingual ✓
Leases
137
$16.24M / yr
Expiring ≤ 18 mo
14
4,212 ac
Fall installments
$8.15M
due Nov 1
Pipeline (CRM)
6
2 proposals out
Lease Landlord Farmed ac Rent/ac Basis Annual Term Spring Fall
Whitesides Land RanchR. Whitesides1,412$385rotation-weighted$543,6202028paid #4471unpaidcalc →
MohlmanD. Mohlman618$402rotation-weighted$248,4362027 ⚠paid #4468unpaidrenew →
Ron HoltonR. Holton947$371rotation-weighted −wheel line$351,3372029paidunpaidcalc →
University of IdahoUI Foundation263$340fixed + CPI$89,4202031paidpaid
RLDR LLC (Honsinger)RLDR LLC53$355fixed$18,8152027paidunpaidrenew →

Rent engine: regional baselines → per-farm adjustments → rotation-weighted, term-discounted (from the 2027 Rent Pricing model) · proposals → lease docs → e-sign (existing pipeline) · payments post to Rent Exp (5410) · sortable columns — try Term to see what expires first

Rotation matrix: every field, every year, one screen — 2019 actuals through the 2030 plan (hatched columns are plan years). Click a year header to sort by that year's crop and see its acreage mix below. Hover any cell for the year mix too.
P potato · SB beet · W/B grain · C corn · H hay · O onion · F fallow
Hover a cell or click a year header for that year's acreage by crop.
One map, three questions: what's planted where (2027), which ground is ours vs leased vs about to expire, and who needs water today. Switch layers, hover for details, click a field to pin it.
Magic Valley — T9S R17E area (stylized) · pivots + gravity rectangles · click a field to pin

Field card

Click a field on the map to pin its details here.

0 selected